Inspection and preventive maintenance schedule -6 – JLG 660SJ Service Manual User Manual

Page 44

Advertising
background image

SECTION 2 - GENERAL

2-6

– JLG Lift –

3121202

Table 2-3. Inspection and Preventive Maintenance Schedule

AREA

INTERVAL

Pre-Start

1

Inspection

Weekly

Preventive

Maintenance

Monthly

Preventive

Maintenance

Pre-Delivery

2

or Frequent

3

Inspection

Annual

4

(Yearly)

Inspection

Every 2

Years

Boom Assembly

9

Boom Weldments

1,2,4,7

1,2,4

Hose/Cable Carrier Installations

1,2,7,9,12

1,2,9,12

Pivot Pins and Pin Retainers

1,2,7

1,2

Sheaves, Sheave Pins

1,2,7

1,2

Bearings

1,2,7

1,2

Wear Pads

1,2,7

1,2

Covers or Shields

1,2,7

1,2

Extend/Retract Chain or Cable Systems

1,2,3,7

1,2,3

Platform Assembly

9

Platform

1,2

1,2

Railing

1,2

1

1,2

Gate

5

1

1,5

Floor

1,2

1

1,2

Rotator

9,5

15

Lanyard Anchorage Point

2

1,2,10

1,2,10

Turntable Assembly

9

Swing Bearing or Worm Gear

1,2,14

1,2,3,13,14

Oil Coupling

9

Swing Drive System

Turntable Lock

1,2,5

1,2,5

Hood, Hood Props, Hood Latches

5

1,2,5

Chassis Assembly

9

Tires

1

16,17

16,17,18

16,17,18

Wheel Nuts/Bolts

1

15

15

15

Wheel Bearings

14,24

Oscillating Axle/Lockout Cylinder Systems

5,8

Outrigger or Extendable Axle Systems

5,8

5,8

Steer Components

Drive Motors

Torque Hubs

11

11

Functions/Controls

9

Platform Controls

5

5

6

6

Advertising
This manual is related to the following products: