Installer guidelines/responsibilities – Autoquip FREIGHTLIFT FL4M User Manual

Page 26

Advertising
background image

26




9.

CLEAN-UP & HAND-OFF

A. Conduct a final inspection of the lift installation using the Installation Checklist in

the Appendix of this manual. Correct any deficiencies before clean-up & hand-off.


B. Apply proper signage to all locations of the installation per the guidelines in the

Label Identification section and per any instructions shipped separately with the
gate interlock kits. Contact Autoquip at 888-811-9876 if labels appear to be
missing or damaged.


C. Train key personnel on the operation of the system and all safety features and

procedures by referencing the corresponding sections in this manual.


INSTALLER GUIDELINES/RESPONSIBILITIES

Advertising