Warning

:

Before power is turned off, the cables carry electrical current.

Removing the crosshead motor cables without turning off the power can cause personnel
injury or death.

Ensure that the main power is off and the Electrical Disconnect is locked out before you
remove the crosshead motor cable. Remove the cables from the safety enclosure wiring
slots carefully when decommissioning the operation box cable if you have a safety enclosure
installed for your system.

8. Remove all cables from the load frame.

a) Remove cables on the crosshead motor.
b) Remove D-connectors for sensors and limit switches along with the cables.
c) Remove the D-connector and its cable on the handset and take the handset off.
d) Open the lower part of the operation box and remove the handset connection cable.

9. If you have a safety enclosure installed for your system, remove it.

10. Remove the load frame anchor bolts.

11. Move the load frame and Integrated Operations Platform to the desired position according to the

instructions in the Lifting and Moving Manual.

Warning

:

Before power is turned off, the cables carry electrical current.

Removing the crosshead motor cables without turning off the power can cause personnel
injury or death.

Ensure that the main power is off and the Electrical Disconnect is locked out before you
remove the crosshead motor cable. Remove the cables from the safety enclosure wiring
slots carefully when decommissioning the operation box cable if you have a safety enclosure
installed for your system.

MTS Criterion

Series 60 | 139