Installation – Regency Bellavista B36XT Medium Gas Fireplace User Manual

Page 15

Advertising
background image

Regency Bellavista™ B36XT Gas Fireplace

15

INSTALLATION

UNIT ASSEMBLY PRIOR TO INSTALLATION

BEFORE YOU START

The Top Facing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the fi replace
is moved into position.

TOP STANDOFF ASSEMBLY

The top standoffs are shipped in a fl at position and must be folded into shape and
attached.

1) Remove the standoffs from the fi replace top.

2) Take each standoff and bend into the correct shape. Bend up at the bend lines until

the screw holes in the standoff and the pre-punched screw holes on the fi replace
top line up.

3) Attach the standoff securely to the top with 2 screws per standoff (on opposite

corners).

TOP FACING SUPPORT


Determine the total thickness of facing material (e.g. drywall or wood plus ceramic tiles) to
allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary
from 1/2" (13mm) to 1-1/4" (32mm) thick.

The Top Facing Support can be mounted in
3 different positions depending on the
thickness of the facing material.

1) Mount Top Facing Support using the 3 supplied screws into the three pre-punched
screw holes on the top front of the unit. Use hole positions A, B, or C depending on your
facing depth.

Screw Facing

Material

Position

Depth

A

1/2" / 13mm

B

7/8" / 22mm

C*

1-1/4" / 32mm

* For "C" screw position the top facing
support is reversed.

Top Facing Support

A

B

C

Screw holes for

Top Facing

Support

Top Facing Support

is reversed

for “C” hole position

A

B

C

"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.

Top Facing

Support

SIDE NAILING STRIPS

The side nailing strips come attached to the unit.
There are 2 plates, one on the top and bottom
that can be folded out as required.

Advertising