2 overview of the instrument, 1 front of the instrument, Front of the instrument – Metrohm 893 Professional Biodiesel Rancimat User Manual
Page 14: Figure 1, Front 893 professional biodiesel rancimat
Advertising
2.1 Front of the instrument
■■■■■■■■■■■■■■■■■■■■■■
6
■■■■■■■■
893 Professional Biodiesel Rancimat
2 Overview of the instrument
2.1
Front of the instrument
1
2
3
4
5
6
7
8
Figure 1
Front 893 Professional Biodiesel Rancimat
1
Iso-Versinic
®
tubing (6.1839.000)
For connecting the reaction vessel to the
measuring vessel. A fluoroelastomer.
2
Measuring vessel cover (6.0913.130)
Contains an integrated conductivity measur-
ing cell.
3
Glass measuring vessel (6.1428.030)
4
Instrument display
Displays the status of the instrument and the
individual measuring positions.
5
FEP tubing 250 mm (6.1805.080)
For supplying air into the reaction vessel.
6
Reaction vessel cover (6.2753.107)
7
Reaction vessels (6.1429.050)
8
Start buttons
Advertising