6 initial start-up, Initial start-up – Metrohm NIRS DS2500 Analyzer User Manual

Page 20

Advertising
background image

3.6 Initial start-up

■■■■■■■■■■■■■■■■■■■■■■

12

■■■■■■■■

3.6

Initial start-up

The initial start-up of the instrument is always carried out with the Vision
software.

This manual contains a short overview of the required steps. You can find
detailed information on the procedure in the tutorial for the software.

Non-regulated indus-
tries

If you put the NIRS DS2500 Analyzer into operation in a non-regulated
industry, carry out the following steps:

1.

Switch on the computer.

2.

Launch the software and log in.

3.

Switch on the instrument and wait until the software has recognized
the instrument.

4.

Create a new project.

5.

Create a Data Collection Method (DCM).

6.

Calibrate the instrument as follows:

a. Run Wavelength Certification.
b. Run Reference Standardization.
c. Run Instrument Calibration.

7.

Run Performance Test.

Running "Wavelength Certification" and "Reference Stan-
dardization"

Required accessories

NIRS reflection standard, 2 pcs. (6.7450.000)

NIRS DS2500 holder for sample cup (6.7430.040)

1 Place the sample cup holder onto the sampling window.

Advertising