6 initial start-up, Initial start-up – Metrohm NIRS DS2500 Analyzer User Manual
Page 20
3.6 Initial start-up
■■■■■■■■■■■■■■■■■■■■■■
12
■■■■■■■■
3.6
Initial start-up
The initial start-up of the instrument is always carried out with the Vision
software.
This manual contains a short overview of the required steps. You can find
detailed information on the procedure in the tutorial for the software.
Non-regulated indus-
tries
If you put the NIRS DS2500 Analyzer into operation in a non-regulated
industry, carry out the following steps:
1.
Switch on the computer.
2.
Launch the software and log in.
3.
Switch on the instrument and wait until the software has recognized
the instrument.
4.
Create a new project.
5.
Create a Data Collection Method (DCM).
6.
Calibrate the instrument as follows:
a. Run Wavelength Certification.
b. Run Reference Standardization.
c. Run Instrument Calibration.
7.
Run Performance Test.
Running "Wavelength Certification" and "Reference Stan-
dardization"
Required accessories
■
NIRS reflection standard, 2 pcs. (6.7450.000)
■
NIRS DS2500 holder for sample cup (6.7430.040)
1 Place the sample cup holder onto the sampling window.