3 connecting the eluent bottle, Connecting the eluent bottle, Figure 3 – Metrohm 941 Eluent Production Module User Manual

Page 24

Advertising
background image

4.3 Connecting the eluent bottle

■■■■■■■■■■■■■■■■■■■■■■

16

■■■■■■■■

941 Eluent Production Module (2.941.0010)

A longer section of silicone tubing (6.1816.020) may have to be cut
to size and mounted (see also the manual for the IC instrument).

5 If one of the instruments in the stack is equipped with a leak sensor

connection socket, connect the leak sensor (see manual of the IC
instrument)
.

6 Restore any capillary connections that may have been removed.

4.3

Connecting the eluent bottle

For the automated eluent production, the eluent bottle must be equipped
with a bottle cap for a level sensor and a sensor of the type "FULL".

Inserting the measuring sensor

Accessories

For this step you need:

A bottle cap for level sensor (6.1626.000)

FULL sensor (6.2769.000) for anion eluents or EMPTY sensor
(6.2769.1X0) for cation eluents

Figure 3

Bottle cap for level sensor - Inserting the measuring sensor

1

Measuring sensor opening
For two measuring sensors (inside) and the
level sensor cable (outside).

2

M6 opening
For the FEP tubing connection to the Dos-
ino.

3

Adsorber opening

4

M8 opening
For the capillary connection to the ion chro-
matograph.

1 Remove the stoppers from the bottle cap.

2 Place the bottle cap on a surface with the opening facing up.

Advertising