Figure 10, Connecting the dosino – Metrohm 941 Eluent Production Module User Manual

Page 35

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

941 Eluent Production Module (2.941.0010)

■■■■■■■■

27

Adapter Dosino port 4 (6.1808.280)

Figure 10

Connecting the Dosino

1

Port 1
For connecting the concentrate bottle.

2

Port 2
For connecting the ultrapure water supply.

3

Port 3
For connecting the eluent bottle.

4

Port 4
For connecting the waste container.

1 Connecting the concentrate bottle

Push the FEP tubing attached to the concentrate bottle through
the cable conduit from the rear to the front of the 941 Eluent Pro-
duction Module.

Screw the FEP tubing onto Port 1 of the Dosino.

2 Connecting the ultrapure water

Push the FEP tubing connected to the ultrapure water canister or
the ELGA PURELAB flex through the cable conduit from the rear
to the front of the 941 Eluent Production Module.

Screw the FEP tubing onto port 2 of the Dosino.

Advertising