Figure 8 – Metrohm 941 Eluent Production Module User Manual

Page 31

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

941 Eluent Production Module (2.941.0010)

■■■■■■■■

23

2 Sealing the M8 opening

Screw the M8 threaded stopper into the M8 opening.

3 Mounting the adsorber

Fill the adsorber tube with soda lime and cotton and insert it into the
large opening. Secure in place with an SGJ clip.

Option: Assembling the bottle cap with level sensor
If you intend to let your ion chromatography system run unsupervised for
extended periods of time, we recommend also monitoring the ultrapure
water canister with a level sensor.

Accessories

For this step you need the following optional accessories:

A bottle cap for level sensor (6.1626.000)

EMPTY sensor for 10 L canister (6.2769.120)

Figure 8

Installing the ultrapure water canister cap with level sensor

1 Inserting the measuring sensor

Insert the two measuring sensors from the inside into the two open-
ings for measuring sensors.

Advertising