ADS Environmental Services Model 3600 530002 A2 User Manual

Page 73

Advertising
background image

4-40

ADS 3600 Flow Monitor O&M Manual

l

Step on the band to determine if any play is present.

Note:

If the band is not completely flush, locate the pre-drilled hole closest to

the sensor. This is rather difficult as you will have to use the touch and feel
method. Once located, use a compressor drill or a 60 cm (24 in.) extended bit
and drill another anchor bolt hole under the flow surface. Secure the anchor
bolt to the pipe and attach the band with a 7/16 in. (11 mm) nut and
corresponding washer.

l

Mold the long end of the band up the pipe wall.

l

Secure the band with anchor bolts up the pipe wall every 60 cm (24 in.) until
the end of the band is reached.

Note:

Ensure the sensor cable is not between the band and pipe during the

installation, or cable damage could result.

l

Cable tie the velocity sensor to the ultrasonic cable and secure with the anchor
bolt at the crown (soffit) of the pipe.

01-19.pcx

Completed 1/2-Mount Velocity Band Installation (Looking Towards the Top of the Pipe)

l

Anchor the bolt and secure the sensor cables every 60 cm (24 in.) along the
pipe crown (soffit) until the invert has been reached.

l

Cut the excess portion of the cable tie.

Note:

If the pipe is large and the velocity sensor cable is not run to the apex

of the pipe, then attach the velocity cable to 13 mm (1/2 in.) PVC tubing that

Advertising