5-1

C H A P T E R 5

Monitor Installation and Activation

Once the adjustable ring and the sensors have been installed into the sewer pipe, you
must install and activate the monitor. If you are not installing a monitor with an IS
modem, you must also install the external modem unit (EMU). As with the ring and
sensors, installing the monitor requires training and should not be attempted by
inexperienced personnel. Because of the hazardous conditions that can exist in sewers
and other places where the monitor is installed, a team of two or more people should
be involved in the installation operation. Specific safety procedures are beyond the
scope of this manual, but you should follow all company and governmental safety
policies.

To learn about:

See page:

Installing the EMU ............................................................................... 5-2

Pavement Box Location ................................................................. 5-3
Underground Services and Lines Location...................................... 5-3
Pavement Box and Cable Trenching ............................................... 5-4
Pavement Box Installation .............................................................. 5-5
External Modem Unit (EMU) Installation....................................... 5-8
Communication Cable Installation................................................... 5-8
Communication and Telephone Cable Wiring................................ 5-12
Direct Connection Communication (SCADA System)................... 5-14
Direct Connection Communication (Portable Computer) .............. 5-15
Baud Rate Setup .......................................................................... 5-15
Jumper Settings ............................................................................ 5-18
Multiplexor Priority Setting .......................................................... 5-20

Monitor Installation............................................................................ 5-22

Telephone Interface Box Installation............................................. 5-23
Lightning Protection Module Installation ...................................... 5-25

Monitor Activation............................................................................. 5-27

Data Collection and Confirmation ...................................................... 5-28