Manually running all zones – Baseline Systems BaseStation 3200 User Manual

Page 75

Advertising
background image

BaseStation 3200 Advanced Irrigation Controller Manual

5. Press the NEXT button to move to the First Zone Delay field, and then press the + or button to set the

amount of time that you want the system to delay before the zone starts running.
Note: Use the First Zone Delay setting to give you time to walk to the zone location so you can observe the

zone running. You can set the delay time from 0 seconds to 10 minutes.

6. Press the NEXT button to move to the Between Zone Delay field, and then press the + or button to set the

amount of time that you want the system to delay before another zone starts running.
Note: If you are only running one zone, you can leave this field set to 0

(zero).

7. When you have finished making changes, turn the dial to the Auto Run

position. When the manual run starts, the main screen shows the

details.

8. If you want to stop the manual run while it is active, press the CLR

button.
Note: When the manual run is complete, the controller changes the

Manually Run Zone(s) setting to OFF.

Manually Running All Zones

1. Turn the dial to the Manual Water position.
2. Make sure that the first field on the screen says Manually Run Zone(s).

If another option displays in this field, press the + button to change the

option to Manually Run Zone(s).

3. Press the NEXT button to move to the next field, and then press the +

or button to select All. If the field is set to OFF, press the + button

one time to change the field to the lowest numbered zone, and then

press the button one time to change the setting to All.
Note: If you decide that you do not want to start a manual run after

you have selected All, press the CLR button to change the setting to

OFF.

4. Press the NEXT button to move to the Zone Run Time field, and then press the + or button to set the

amount of time that you want each zone to run.

5. Press the NEXT button to move to the First Zone Delay field, and then press the + or button to set the

amount of time that you want the system to delay before the first zone starts running.
Note: Use the First Zone Delay setting to give you time to walk to the zone location so you can observe the

zone running.

6. Press the NEXT button to move to the Between Zone Delay field, and

then press the + or button to set the amount of time that you want

the system to delay before another zone starts running.

7. When you have finished making changes, turn the dial to the Auto Run

position. When the manual run starts, the main screen shows the

details.

8. If you want to stop the manual run while it is active, press the CLR

button.
Note: When the manual run is complete, the controller changes the Manually Run Zone(s) setting to OFF.

Page

67

Advertising