Programming – Carlo Gavazzi WM4-96 User Manual

Page 33

Advertising
background image

33

Programming

Holidays period

31

DMD/AVG calculation

17

37

FIXED AVERAGE CALCULATION

FLOAT AVERAGE CALCULATION

Where:

Pmax is the maximum measured power,
Pc is the contractual power,
t1 is the selected average period

Advertising