Hardware installations, Installation procedure – Contec SEH-9450-LAS User Manual

Page 18

Advertising
background image

3. Hardware Installations

SEH-9450-LAS

11

3. Hardware Installations

This chapter provides information on how to use the jumpers and connectors on the product in order to set
up a workable system.

Installation procedure

(1) Confirm the power supply is off.

(2) Install the processor with correct orientation.

(3) Mount the Heat sink on the top of the processor. (The heat sink with a fan connects a fan cable to

the fan connector on a board.)

(4) Insert the DDR2 SDRAM module with correct orientation.

(5) Confirm this product into to PICMG backplane.

(6) Insert all external cables. (Keyboard, Mouse, LAN, etc)

(7) Prepare a CRT monitor for CMOS setup.

(8) Turn on the power.

(9) Enter the BIOS setup mode by pressing ‘DEL’ key during boot up.

(10) Use the ‘Load BIOS Optimal Defuals’ feature.

(11) Configure the Peripheral Setup and the Standard Setup correctly.

CAUTION

The CMOS memory may be in an undefined state at power-on after a period of no battery backup.











Advertising