Figure 2a – Arc Machines 415 WDR User Manual

Page 23

Advertising
background image



Model 415
Operation Manual

7.

At this point, operations can begin.

NOTE

After the system is turned on, and cabling is connected for the first time, some of the cooling

system reservoir contents will be used to fill the cooling cables. Sometime after initial turn on

be sure to check the reservoir level and add coolant mixture again.

NOTE

During the first production run of M-415s there were two (2) types of transformers offered by AMI.
If your Power Supply was manufactured before January 1999 the below figure may be used for
Transformer terminal setup.

INTERNATIONAL TRANSFORMER TERMINAL JUMPER SET UP

200 VOLT TERMINAL JUMPER SETTINGS

Document No. 740084

Revision N

18

12 11 10 9

W1

8 7 6 5

V1 4 3 2 1

U1

220 VOLT TERMINAL JUMPER SETTINGS

12 11 10

9 W1 8 7 6

5 V1 4 3 2

1 U1

380 VOLT TERMINAL JUMPER SETTINGS

12

11

10 9 W1 8 7

6 5 V1 4 3

2 1 U1

415 VOLT TERMINAL JUMPER SETTINGS

12

11 10 9 W1 8

7 6 5 V1 4

3 2 1 U1





DOMESTIC USA TRANSFORMER TERMINAL JUMPER SET UP

230 VOLT TERMINAL JUMPER SETTINGS

12 11 10 9

W1

8 7 6 5

V1 4 3 2 1

U1

240 VOLT TERMINAL JUMPER SETTINGS

12 11 10

9 W1 8 7 6

5 V1 4 3 2

1 U1

440 VOLT TERMINAL JUMPER SETTINGS

12

11

10 9 W1 8 7

6 5 V1 4 3

2 1 U1

480 VOLT TERMINAL JUMPER SETTINGS

12

11 10 9 W1 8

7 6 5 V1 4

3 2 1 U1

FIGURE 2A



Advertising