Arc Machines 415 WDR User Manual

Page 5

Advertising
background image



Model 415
Operation Manual

Document No. 740084

Revision N

iv

TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

SECTION V

OPERATION

5.0

Introduction

30

5.1

Initial Power-On

30

5.2

Power Supply Calibration Introduction

30

5.3

Required Equipment For Calibration

31

5.4

Main Reference Voltage Calibration 31

5.5

Position Feedback Voltage Calibration

32

5.6

Current Calibration 32

5.7

Arc Voltage Calibration 35

5.8

Weld Head Travel Calibration Introduction

36

5.9

Weld Head Travel Calibration

37

5.10

Weld Head Wire Feed Calibration

38

5.11

System Security

39

5.12

Project Data Recording

40

5.13

General Maintenance 40

5.14

System Fault Corrections 41

5.15 Re-Shipping

42

5.16

Selecting and Creating Languages

43

5.17

Creating and Editing Weld Head Templates

45

5.18

CMOS Battery Replacement

47



LIST OF ILLUSTRATIONS

NUMBER

DESCRIPTION PAGE


Figure 1

System Configuration 14

Figure 2

AC Power Set Up (Transformer jumpers - International) 15

Figure 2A

AC Power Set Up (Transformer jumpers - Domestic) 18

Figure 3

Cable Connections 19

Figure 4

Status Screen/Initial Turn-On 20

Figure 5

Sequence Timing Chart

29

Figure 6

CMOS battery location on EP811 motherboard 47

Figure 7

CMOS battery location on SBC84710 motherboard 48















Advertising