Diagram 3 – Arc Machines 415 WDR User Manual

Page 38

Advertising
background image



Model 415
Operation Manual

3. The Weld Current calibration schedule will be run in WELD Mode and will contain the following:

Onelevel Functions

Prepurge

10

Torch Gas Rate

40*

Upslope

1.0

Start Level

25

Num Starts

1

Postpurge

20

Level Advance

Manual

Downslope

5.0

Stubout Mode

On*

Start Mode

Touch*

Multilevel Level 1 Functions

Pri Amps

200

Bck Pulse

10.0

Bck Amps

200

Pulse Mode

OFF

Pri Pulse

10.0

Travel Step

OFF


Multilevel Level 2 Functions

Pri Amps

400*

Bck Pulse

10.0

Bck Amps

400*

Pulse Mode

OFF

Pri Pulse

10.0

Travel Step

OFF

*Maximum torch value of 300 amps – use 300 amps here. Step 5.6-6-9 value would then be
3.75 VDC +/- 0.037 VDC.

4.

Level Time will be in the Manual Mode requiring the operator to Sequence stop the M-415

after measurements and any required adjustments are done. Pulse Mode should be OFF so

only the Primary Current Amps is checked. The Primary Amps should be set to 200 for the

Initial measurement. Insure that the Travel Mode switch is set to OFF. It is very important

the calibration measurements are done quickly, so not to melt the work piece. A suggestion
is to make the necessary connections to the PCB test points and disconnect the test
leads at the DMM until an arc is established.

5.

Recall from the LIBRARY the appropriate Calibration Weld Schedule.

6.

CURRENT

CALIBRATION WITHOUT EXTERNAL SHUNT


1.

Connect the negative test lead to TP-2 and the positive test lead to TP-1 of the weld

current servo. The Current Servo (P/N 13D150300-01) can be accessed through an

opening in the upper deck plate just below the Interface PCB.


TP-1

R-39

DO NOT ADJUST

FACTORY PRESET





INTERFACE A 0/1 B 0/1

TP-2

TP-3

R36

DIAGRAM 3

Document No. 740084

Revision N

33