Step 16: final touches – BoonDocker ARCTIC CAT: M1000 Race Gas User Manual

Page 24

Advertising
background image

Revised 11/18/08

Arctic Cat M-1000 Turbo Installation instructions

Page 24

www.boondockers.com............................

BoonDocker

..........................................877-522-7805




A. Install the charge tube from the intercooler
to the turbo as shown in picture.

F. B. Locate the black poly line, insert the line in the plastic push to connect fitting on the

bulkhead fitting (installed in step 7E) and connect it to the push to connect fitting on the
copper cap we installed in part 7C.

G. Install the push to connect 90 on the charge tube in the form drilled hole closest to the rear of

the sled.

H. Route the black poly line from the bulkhead fitting to the charge tube, you can use the

provided 3/16” clear tubing to cover the poly line, this will help protect the poly line.

I. Zip tie the poly line away from any sharp or moving objects.

Step 16: Final Touches

Parts Needed: Tools Needed:

Snorkel filter Basic tool set
Oil tube w/dipstick Assembly lube




A. Using assembly lubrication, thoroughly coat the

oil tube, and insert it into the oil tank.




Advertising