Left hand mullion shown, right hand opposite, Series 433 triple set installation instructions – EFCO 433 Series User Manual

Page 20

Advertising
background image

June 2012

PART NO. Y017

Page 20 of 90

Series 433 Triple Set Installation Instructions

SECTION III: Fabrication
























D.

Drilling Template Center-Set Shear Block Verticals (Center-Set Mullion)

Left Hand Mullion Shown, Right Hand Opposite

Use the exterior edge of the vertical to align Drill Jig DJ14. Use .182 dia. (#14) drill at
darkened areas only.

These preps work for both inside and outside glazed versions.

Center-Set Mullion

(Reverse Drill Jig for

the opposite side)

Inside Glazed

Outside Glazed

DJ14

CENTER SET

CENTER S

ET

OFF SET

4

33 S.

B.

433 S.B.

CENTER SET

CENT

ER

SET

OFF SET

DJ14

CENTER S

ET

CENT

ER SE

T

433

S.

B.

DJ14

CENTER SET

CENTER SET

OFF

S

E

T

OF

F S

E

T

4

33 S

.B.

DJ
14

433

S.

B.

DJ14

4

33 S

.B.

O

F

F SET

OFF

S

E

T

CENTER S

ET

CENT

ER SE

T

DJ14

CENTER SET

CENTER SET

Advertising