EFCO 433 Series User Manual

Page 25

Advertising
background image

June 2012

PART NO. Y017

Page 25 of 90

Series 433 Triple Set Installation Instructions

SECTION III: Fabrication























Drill one side and flip the fixture to drill the opposite side.

(Typ. at each end)

Fixture DJ13 should be placed at the end of the sills as

shown. These preps work on all offset and center-set sills.

Use .246 Diameter (#D) Drill Bit

F.

Drilling Template for Offset and Center-Set Shear Block at Sills

(Typ. at each end)

8362

FU20

CENTER THE .246

DIA. HOLE AT

MIDPOINT OF FLAT

FU19

8372

8372

FU19

FU19

FU19

DJ13

DJ13

DJ13

45°

1"

1"

1"

1"

Advertising