Step 5) chalk line for subsill, Step 6) sealant bed, Includes offset and center-set glazing) – EFCO 433 Series User Manual

Page 53

Advertising
background image

June 2012

PART NO. Y017

Page 53 of 90

Series 433 Triple Set Installation Instructions

SECTION VI: Subsill Fabrication and Installation

(Includes Offset and Center-Set Glazing)























Step 5) Chalk Line for Subsill

Before installing the subsill, measure the distance from the exterior of the condition to
the desired location at the EXTERIOR of the subsill. (The exterior of the subsill will be
flush with the rest of the system.) Do this at both ends of the condition. Snap a chalk

line between the two marks to align the subsill. If the condition is too wide for just two
marks, measure every 15 feet and snap a chalk line.

Step 6) Sealant Bed

Apply sealant to the subsill as shown in Figures 9 and 10. Place the subsill into the
rough opening, and rotate the exterior face down into position. Apply enough sealant
to ensure a complete seal as shown in

Figure 11.

SEALANT

SUBSILL

4471

SEALANT

SEALANT

SUBSILL
4471

CONDITION

SUBSILL
2S44

SEALANT

SEALANT

SUBSILL

2S44

SUBSILL
2S44

[FIG. 9]

[FIG. 10]

[FIG. 11]

Advertising