Step 7) glass installation, Structural glazed head and sill through – EFCO 433 Series User Manual

Page 81

Advertising
background image

June 2012

PART NO. Y017

Page 81 of 90

Series 433 Triple Set Installation Instructions

SECTION IX: Glazing

(Includes Captured and Structural Glazed Mullion Systems)























Step 7) Glass Installation

Structural Glazed Head and Sill Through

A) Make sure the glazing blocks are still in place in the D.L.O. as instructed in Figures

98 and 99.
- For the following steps use Figures 104 through 106 below.

B) Prior to glass install, place WM80 tape into position on SSG mullion.
C) Position the glass on the appropriate side of the framing without the removable

glass stop installed. Shift the glass out past the structural glaze mullion and into the
deep pocket to begin glass installation, ensure the glass does not wipe the WM80 tape

out of position.
D) Swing the opposite edge of the glass around to align with the glazing pocket.

E) Slide the glass until there is the correct glass bite shown on both D.L.O. edges.
(7/16" @ captured vertical and 3/4" at SSG vertical.)

F) Snap on the removable glass stop and install the antiwalk blocks and glazing gasket.
Use the instructions on page 79 for gasket installation. See Figures 114 through 119 on

pages 86, 87 and 88 for installation of the snap-in glass stop and antiwalk blocks.

[FIG. 104]

[FIG. 105]

[FIG. 106]

D

B

E

C

TEMPORARY

PIECES OF

GLAZING GASKET

D

B

Advertising