Series 433 Triple Set Installation Instructions

TEMPORARY GLAZING

CLIPS (HGR1)

TEMPORARY

PIECES OF

GLAZING GASKET

D

C

D

D

B

A

SECTION IX: Glazing

(Includes Captured and Structural Glazed Mullion Systems)























Step 8) Glass Installation

Structural Glazed Vertical Through

- For the following steps use Figures 107 through 109.
A) Make sure the setting blocks are placed at 1/4 points in each D.L.O. or as required

on the architectural drawings. See Figure 99 on page 78.
B) Prior to glass install, place WM80 tape into position on SSG mullion.

C) Position the glass at the exterior of the framing with the head and sill face covers
removed. Lift the glass into the frame and onto the setting blocks; ensure the glass

does not wipe the WM80 tape out of position.
D) Shift the glass into the pocket in the perimeter jamb until there is the correct glass
bite on both edges of the D.L.O. (7/16" captured vertical or 3/4" SSG vertical).

E) Install the appropriate covers. Place temporary pieces of the glazing gasket along
the head, perimeter jamb, and sill. Place the temporary glazing clips in the structural

mullion race, and rotate to hold glass at the structural mullion. See Figure 108. Install
all glazing gaskets. See Figure 101 on page 79. Install the next lite before filling the

structural glazing gap. See Figure 110 on page 83.

[FIG. 106]

[FIG. 107]

[FIG. 108]