Step 7) subsill anchor installation, Includes offset and center-set glazing), Fig. 12] [fig. 13 – EFCO 433 Series User Manual

Page 54

Advertising
background image

June 2012

PART NO. Y017

Page 54 of 90

Series 433 Triple Set Installation Instructions

SECTION VI: Subsill Fabrication and Installation

(Includes Offset and Center-Set Glazing)























Step 7) Subsill Anchor Installation

At a minimum, anchor at 6" from jambs and corners and 16" O.C. Staggering locations

from one side of thermal area to the other for 2S44 only.

For standard applications, utilize anchorage shown in Figure 12. If heavy-duty

anchorage is required, install standard anchors as shown, and refer to the location of
heavy-duty anchors as shown in Figures 14 through 18 on page 51

.

SUBSILL
2S44

SUBSILL
4471

(ANCHORING FASTENERS NOT SUPPLIED BY EFCO)

SUBSILL

2S44

SUBSILL

4471

These recommendations are for general erection procedures only. For actual job

conditions, see the details on the shop drawings. For perimeter anchor type and
spacing, refer to the approved shop drawings or consult the project design professional.

[FIG. 12]

[FIG. 13]

Advertising