Unit assembly, V subsill fabric, Fig. 1] [fig. 2 – EFCO 945 Series User Manual

Page 11: Page 9

Advertising
background image

945 QUICKSET

8310

8307

KDE 11/2003

SECTION IV - UNIT ASSEMBLY

8307

JAMB

8309

VERT.

MULLION

8312

8313

VERT.

EXPANSION

MULLION

JAMB

8310

8308

FABRICATED

AS RIGHT
JAMB

SHALLOW

POCKET

DEEP
POCKET

FABRICATED

AS RIGHT

INTERMEDIATE

FABRICATED

AS LEFT

INTERMEDIATE

DEEP
POCKET

FABRICATED

AS LEFT

INTERMEDIATE

SHALLOW

POCKET

DEEP
POCKET

[FIG. 1]

[FIG. 2]

HN50

WALK

BLOCK

OPTIONAL

FABRICATED

AS RIGHT

INTERMEDIATE

B. Check the fabrication to ensure that the vertical mullion and vertical mullion

filler are fabricated opposite of each other. If the mullion is fabricated for the

right, the filler should be fabricated for the left. The vertical expansion mullion

should be fabricated the same way. See Fig. 2 below.

FABRICATED

AS LEFT JAMB

STEP 1) GENERAL NOTES

A. Ensure that all tooling is correct before assembly. For each D.L.O. there

should be a deep pocket and a shallow pocket. If only one D.L.O. is required,

both pockets will be deep. The glass will not be able to be loaded with two

shallow pockets. Also, keep all deep pockets on center D.L.O.'s on the same
side of the D.L.O. See Fig. 1 below.

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS