Fig. 12, Fig. 11, Step 7) sealant bed – EFCO 945 Series User Manual
Page 18: Con’t)
Advertising
Apply sealant to the subsill as shown in
Figure 11. Place the subsill into the rough
opening, and rotate the exterior face down
into position. Apply enough sealant to
ensure a complete seal as shown in
Figure 12.
Wipe off any excess sealant from the exterior of the subsill.
SEALANT
CONDITION
[FIG. 12]
SUBSILL
2G22
SUBSILL
2G22
SUBSILL
2G22
[FIG. 11]
SEALANT
INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS
STEP 7) SEALANT BED
BAB 11/2000
SECTION V - SUBSILL FABRICATION
(CON’T)
PAGE 16
Advertising