Fig. 12, Fig. 11, Step 7) sealant bed – EFCO 945 Series User Manual

Page 18: Con’t)

Advertising
background image

Apply sealant to the subsill as shown in

Figure 11. Place the subsill into the rough

opening, and rotate the exterior face down

into position. Apply enough sealant to

ensure a complete seal as shown in

Figure 12.

Wipe off any excess sealant from the exterior of the subsill.

SEALANT

CONDITION

[FIG. 12]

SUBSILL

2G22

SUBSILL

2G22

SUBSILL

2G22

[FIG. 11]

SEALANT

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS

STEP 7) SEALANT BED

BAB 11/2000

SECTION V - SUBSILL FABRICATION

(CON’T)

PAGE 16

Advertising