Anchoring the second ladder, Step 11) perimeter seal, Fig. 43 – EFCO 945 Series User Manual

Page 35: Con’t), Step 10) anchoring the second ladder, Head (w/ strap anchor), Jamb, Head (w/o strap anchor)

Advertising
background image

The same action is required for outside glazed and

structural glazed mullions also. Make sure that the

face covers are installed prior to the perimeter seal

for these members. This step will be completed

after glass installation.

When the unit is installed and anchored, begin placing caulk rope into the gap

between the perimeter and the frame. Then apply a generous amount of silicone

type sealant to the gap between the frame and rough opening. Tool off all excess

sealant to ensure a good seal and to achieve an appropriate appearance. See

Figure 43.

STEP 11) PERIMETER SEAL

HEAD (W/ STRAP

ANCHOR)

SEALANT

[FIG. 43]

SEALANT

8310

8307

JAMB

SEALANT

SEALANT

8300

HEAD (W/O STRAP

ANCHOR)

8300

BAB 11/2000

SEALANT

SEALANT AROUND

ANCHOR AND AT

PERIMETER

FT46

SECTION VIII - INSTALLATION

(CON’T)

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS

STEP 10) ANCHORING THE SECOND LADDER

After the filler is snapped correctly, anchor the head and jamb as shown on

Pages 27 and 28.

PAGE 33

Advertising