Door stop cut length, Note: please reference efco's "understandin, Step 9) filling the structural glazing gap – EFCO 945 Series User Manual

Page 48: Fig. 68, Structural glazed mullion systems

Advertising
background image

SECTION IX - GLAZING (cont.)

STRUCTURAL GLAZED MULLION SYSTEMS

STEP 9) FILLING THE STRUCTURAL GLAZING GAP

After the interior sealant has cured, typically an overnight setup is required. Mask off the

glass edges with masking tape to minimize cleanup and provide a professional

appearance. Then remove the temporary glazing clips and proceed with filling the void

between the glass units at the exterior with backer rod and structural silicone sealant for

a weather tight seal. At the horizontal members, fill the cavity with sealant to fill the void

out to the gasket. See Figure 68. Tool sealant using a putty knife across the glass

edges. Remove excess silicone from the glass surface by removing the masking tape

before a skin begins to form. Any excess sealant on the glass units can be removed with

a razor blade.

MDM

01/2007

1" GLASS

TYP. S.S.G. VERTICAL

8320

STRUCTURAL
SILICONE

1" GLASS

STRUCTURAL SILICONE

STRUCTURAL
SILICONE

NOTE:

THE SUCCESS OF STRUCTURAL SILICONE GLAZED PROJECTS HAS BEEN THE RESULT
OF COMPATIBILITY TESTS PERFORMED ON ACTUAL MATERIALS SUPPLIED TO THE

PROJECT. THE INSTALLER MUST MAKE SURE THAT SUCCESSFUL COMPATIBILITY

TESTS ARE PERFORMED IN ACCORDANCE WITH THE SILICONE MANUFACTURER'S

RECOMMENDATIONS AND PROCEDURES.

W160

FACE COVER

[FIG. 68]

PAGE 46

- THIS PROCEDURE APPLIES TO THE STANDARD STRUCTURAL GLAZED

VERTICAL AND THE STRUCTURAL GLAZED EXPANSION MULLION. -

Advertising