- For the following steps, use Figures 61 and 62.

A) Make sure the setting blocks are placed at 1/4 points in each D.L.O. or as

required on the architectural drawings. (See Figure 57 on Page 41)

B) Position the glass at the exterior of the framing with all the face covers removed.

Lift the glass into the frame and onto the setting blocks.

C) Shift the glass until there is equal glass bite on both edges of the D.L.O.

D) Install the vertical and horizontal face covers. Place temporary pieces of the

glazing gasket along them, as shown in Figure 60 below. Install all glazing gaskets.

See Step 8 on Page 45.

CUT LENGTH FOR ALL REMOVABLE GLASS STOPS = D.L.O. - 1/32"

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS

STEP 6B) GLASS INSTALLATION (OUTSIDE GLAZED)

SECTION IX - GLAZING (cont.)

PAGE 42