Drilling template for captured mullions, Fabrication, A. drilling template – EFCO 945 Series User Manual

Page 7: Page 5

Advertising
background image

A C

C

A

B C

RH

B

A

C

A C

LH

A C

C

A

LH

RH

B C

B

A

C

A C

A C

C

A

B

B C

RH

LH

A

B

A C

B C

C

A

B

RH

LH

B C

B

C

USE SIDE #2 OF JIG FOR FABRICATION

OF CAPTURED MULLIONS.

USE THE INTERIOR SIDE OF THE GLASS

POCKET EDGE TO ALIGN JIG. MAKE

SURE THAT THE FABRICATION HOLES

ARE IN THE CORRECT POSITION BEFORE

DRILLING.

A C

F945

DJO4

(2)

#2 DRILL

A

A C

B C

F945

DJO4

(2)

#2 DRILL

C

B C

F945

DJO4

(2)

#2 DRILL

B

A = SILL HOLE LOCATIONS

B = HEAD AND INTERMEDIATE

HORIZONTAL HOLE

LOCATIONS

C = BLIND PASS HORIZONTAL

HOLE LOCATIONS

8344

BAB 11/2000

8302

8301

LEFT HAND STANDARD INT. VERTICAL (8308) SHOWN. RIGHT HAND OPPOSITE.

SECTION III A - DRILLING TEMPLATE FOR

CAPTURED MULLIONS

B C

F945

DJO4

(2)

#2 DRILL

B

8300

PAGE 5

A

C

A C

F945

DJO4

(2)

#2 DRILL

A C

B C

LH

B C

RH

C

B

A

B

Advertising