Fig. 58, Step 6a) glass installation (inside glazed), Fig. 57 – EFCO 945 Series User Manual

Page 43: Fig. 59

Advertising
background image

CUT LENGTH FOR ALL REMOVABLE GLASS STOPS = D.L.O. - 1/32"

D

[FIG. 58]

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS

STEP 6A) GLASS INSTALLATION (INSIDE GLAZED)

A) Make sure the setting blocks are placed at 1/4 points in each D.L.O. or as required on the

architectural drawings. (See Figure 57)

- For the following steps, use Figures 58 and 59.

B) Position the glass on the interior of the framing without the removable stop installed. Shift

the glass into the deep pocket to begin glass installation.

C) Swing the opposite edge of the glass around to align with the glazing pocket.

D) Slide the glass into the shallow pocket and lower onto the setting blocks. Shift the glass

until there is equal glass bite on both edges of the D.L.O.

E) Snap-on the removable stop and install the glazing gasket. See Step 8 on page 45.

[FIG. 57]

SETTING

BLOCKS

A

B

C

[FIG. 59]

B

D

E

PAGE 41

1/4

D.L.O.

D.L.O.

1/4

D.L.O.

SECTION IX - GLAZING (cont)

MDM

01/2007

Advertising