Hcw6, Con't), Step 3) baffle fabrication – EFCO 945 Series User Manual

Page 16: Fig. 8, Fig. 9] step 4) weep baffle installation

Advertising
background image

945 Quick Set

DPS 8/2001

3/8"

1/2"

HCW6

SECTION V - SUBSILL FABRICATION

(CON'T)

INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS

STEP 3) BAFFLE FABRICATION

Weep baffles are cut from (1) HCW6, halved. This provides (2)

weep baffles per HCW6. See Fig. 8 below.

[FIG. 8]

2G22

WEEP BAFFLE

SEALANT

WEEP BAFFLE

[FIG. 9]

STEP 4) WEEP BAFFLE INSTALLATION

Apply a small amount of silicone type sealant to the baffles, and locate

them over the weep holes.

-- DO NOT PLUG THE WEEP HOLES WITH SEALANT--

PAGE 14

3/4"

2"

2"

1/2"

Advertising