Hcw6, Con't), Step 3) baffle fabrication – EFCO 945 Series User Manual
Page 16: Fig. 8, Fig. 9] step 4) weep baffle installation
Advertising
945 Quick Set
DPS 8/2001
3/8"
1/2"
HCW6
SECTION V - SUBSILL FABRICATION
(CON'T)
INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS
STEP 3) BAFFLE FABRICATION
Weep baffles are cut from (1) HCW6, halved. This provides (2)
weep baffles per HCW6. See Fig. 8 below.
[FIG. 8]
2G22
WEEP BAFFLE
SEALANT
WEEP BAFFLE
[FIG. 9]
STEP 4) WEEP BAFFLE INSTALLATION
Apply a small amount of silicone type sealant to the baffles, and locate
them over the weep holes.
-- DO NOT PLUG THE WEEP HOLES WITH SEALANT--
PAGE 14
3/4"
2"
2"
1/2"
Advertising