To ensure that the unit will assemble correctly, verify that the structural glazed mullion

and filler are fabricated opposite of each other. Apply butyl type sealant to the end of all

horizontal members that come into contact with the structural glazed mullion. Install

anchors into the head. Before assembly, apply wax lubricant to all STC8 fasteners.

Fasten the structural glazed mullion to all horizontal members. Fasten the opposite

vertical mullion, jamb, etc. to the other end of the horizontals. Make sure that butyl type

sealant has been applied to the other ends of the horizontal members. Ensure that

anchor straps have been installed if required. Wipe off all excess sealant.

ANCHOR

FT46 (SHOWN)
FT47 OPTIONAL

NOTE: For inside glazed systems, install

exterior glazing gasket (WC12) prior to

assembly. For outside glazed systems,

install interior glazing gasket (WNE0) prior

to assembly of units.

STRUCTURAL GLAZED

MULLION

(8320)

[FIG. 5]

HEAD

(8338)

GENERAL NOTE: If the D.L.O. is 36" wide or less, 2

strap anchors are required. D.L.O.’s greater than 36"

require 3 anchors. Anchor widths and locations

should be verified by a structural engineer for job

specific conditions.

SILL

(8343)

APPLY BUTYL TYPE SEALANT TO THE

AREA THAT CONTACTS THE VERTICAL

MULLION FILLER BEFORE ATTACHING

TO THE VERTICAL MULLION FILLER.

MULLION SNAP-IN
FILLER

(8309)

STC8

INT. HORIZONTAL

8341 (SHOWN)
8337 OPTIONAL

STRUCTURAL GLAZED MULLION SYSTEMS

STEP 4) STRUCTURAL GLAZED SYSTEM ASSEMBLY

SECTION IV - UNIT ASSEMBLY

(CON’T)

PAGE 12

BAB 11/2000