Torbal AGS100 250C PRO Manual User Manual

Page 36

Advertising
background image

36

5. To begin Calibration, select option 1. EXTERNAL CALIBRATION and press the ENTER key to start the

calibration process.

6. Before calibration begins, the scale will perform an automatic tare.

7. After the tare is complete, the screen requests that the External Load, whose value is shown on the

screen, be placed on the pan.

8. Place the External Load on the pan.



Advertising
This manual is related to the following products: