E. Install an inverted bucket steam trap and check valve at least 12 inches below steam coil

as close to the coil as possible.

F. A vacuum breaker

should be

installed in the piping. This will prevent the condensing

steam from causing a vacuum inside the coil and possibly damaging the coil.

G. The supply and return lines

should be

insulated. This will save energy and provide for the

safety of the operator and maintenance personnel.

H. Water pocket in the supply line, caused by low point, will provide wet steam to the coil

possibly causing coil damage.

All

horizontal runs of steam supply piping should be pitched

1/4-inch for every one (1) foot back towards the steam supply header causing any

condensate in the line to drain to the header. Install a bypass trap in any low point to

eliminate wet steam.