Machine service, Daily, Weekly – B&C Technologies PF Series User Manual

Page 24: Monthly, Chapter 7 machine service, 1 daily, 2 weekly, 3 monthly

Advertising
background image

Chapter 7

Machine Service

7.1

Daily

• Errors that appears on the display of the operation panel must be corrected immediately.

• Items stuck or jammed inside of the machinemust be removed first. Any item that interferes

with the operation of the photocells must be removed.

• If the machine has not operated for a long duration (vacation or other extended idle time),

run the machine 5 minutes using the endurance programm. This simulation programm en-
sures that the machine runs correctly.

7.2

Weekly

• Clean the photocells (if necessary often)

• Cleaning of the machine with vacuum cleaner - no harsh chemicals, sprays, or wet cleaners

of any kind!

• Defective belts must replaced

• Confirm the oil level and fill if needed

• Check battery charge state (on the panel in the settings menu under Machine state)

7.3

Monthly

• Check the tension of the driving elements.

20

Advertising