Hangar 9 Pulse XT 60 ARF User Manual

Page 37

Advertising
background image

37

Required Parts

• Fuselage assembly

• Switch

• Receiver

• Receiver battery

• Y-harness or two 3-inch (76mm) extensions
• Hook and loop strap (short)

Required Tools and Adhesives

• Foam rubber

• Masking tape

Step 1

Install the switch harness on the side of the fuselage. The

covering will have to be removed from the fuselage using

a hobby knife to expose the opening.

Note: A pre-cut opening for a smaller

switch harness is located near the

front of the cockpit of your model.

Step 2

Wrap the receiver in foam to protect it from vibration.

Make the connections for any servos, extensions or

switches to the receiver.

Step 3

Secure the receiver as shown using a hook and loop

strap. When using a remote receiver, attach the receiver

as described in the instructions provided with your radio

system, placing it as far away from the main receiver and

as high in the fuselage as possible.

Note: An antenna tube has been installed in

the fuselage between the servos to route the

receiver antenna to the rear of the fuselage.

Step 4

Wrap the receiver battery in foam to protect it from

vibration. Secure the receiver battery as shown using

a hook and loop strap. The receiver battery can be

moved rearward in the fuselage to correctly balance your

aircraft if necessary.

Section 6: Receiver Installation

Advertising