Laars heating systems, Figure 14. wiring schematic (ladder diagram) – LAARS Pennant PNCV (Sizes 200, 300, 400) - Install and Operating Manual User Manual

Page 25

Advertising
background image

LAARS Heating Systems

Page 24

Pennant 200, 300, 400

Page 25

Figure 14. Wiring Schematic (Ladder Diagram).

L1

S1

IGN

CTRL

S2

L2

IGN

CTRL

120 VAC

CNTRL

C1

MV

TH

AIR FLOW

SWITCH

PSW

GAS VALVE 2

(IF EQUIPPED)

STAGE 2

GAS VALVE 1

STAGE 1

WATER FLOW

FLOW

SWITCH

OTHER

INTLKS

JMPR

F1

F2

IGN

CTRL

FUSE

120 VAC

24 VAC

BLOWER

PUMP

HOT

PUMP

NEU

PUMP

(IF EQUIPPED)

AIR FLOW

24V

GND

IGNITION BOARD

BAS

C1

BAS

NO1

MANUAL

RESET

HIGH LIMIT

LWCO

JMPR

LWCO

COM

LWCO

NO

(IF LWCO IS

SUPPLIED JMPR

REMOVED)

MAIN POWER

SWITCH

24V

GND

TEMP CONTROL

7

8

5

6

L1

L2

11

12

DRY ALARM

CONTACTS

3

4

CLASS 2 120/24VAC

50VA TRANSFORMER

COM

K2

CALL FOR HEAT

K2A

POWER ON

P1

P2

FUSIBLE LINK

(200 ONLY)

9

10

BLOCKED

VENT

SWITCH

TDR 1

24V

TDR 3

GND

TIME DELAY RLY

TDR 6

INITIATE

TDR 2

COM

TDR 4

NO

TIME DELAY RLY

POWER ON

IGNITOR

STAGE 2 INITIATE

(IF EQUIPPED)

THERMISTOR #1

THERMISTOR #2

LED

LED

REMOTE

LED

LED

HIGH LIMIT

LED

LED

LED

LED

LED

LOCAL

REMOTE

5

1

2

LOOP 2

CONTACTS

FAN PROVE

SWITCH

CNTRL

NO1

STAGE 1 INITIATE

IGN

CTRL

IGN

CTRL

IGN

CTRL

MAIN VALVE

CNTRL

C2

CNTRL

NO2

CNTRL

RT1+

CNTRL

RT1-

CNTRL

C3

CNTRL

RT2+

CNTRL

IND+

CNTRL

IND-

CNTRL

RT2-

CNTRL

INP+

CNTRL

INP-

CNTRL

NO3

CNTRL

C4

CNTRL

NO4

Advertising
This manual is related to the following products: