Load Distribution

Consideration for proper load distribution should be followed when connecting devices. Be sure to evenly distribute
the load across the phases. Refer to the following charts.

For convenience, these phase specifications are printed on the front panel of each Breakout Box.

Figure 2-1: Phase Specifications

15A 208V Breakout Box

Connector

Phase

1

X - Y

2

Y - Z

3

Z - X

4

X - Y

5

Y - Z

6

Z - X

15A 120V Breakout Box

Connector

Phase

1

X - N

2

Y - N

3

Z - N

4

X - N

5

Y - N

6

Z - N

30A 208V Breakout Box

Connector

Phase

1

X - Y

2

Y - Z

3

Z - X

15A/30A Mixed Breakout Box

Connector

Phase

1 (15A)

X - Y

2 (15A)

X - Y

3 (30A)

Y - Z

4 (30A)

Z - X

4

1

15A x 6

208V

MODEL

20-9680-6615

XØ-YØ

XØ-YØ

Phases Loaded

Connector Number

Advertising