TriangleTube Prestige Excellence Part 1 User Manual

Page 23

Advertising
background image

Boiler Piping

Additional Limit Control

If a separate LWCO device is required by cer-
tain local jurisdictions or when the boiler is
installed above the system piping, the follow-
ing guidelines must be followed:

- The LWCO device must be designed

for water installations, electrode probe-
type is recommended.

- The LWCO device must be installed in

a tee connection on the boiler supply
piping above the boiler.

- Wiring of the LWCO device to the PRES-

TIGE Excellence is done directly onto the
24V terminal strip, reference Fig. 20 page
29 for available terminals for an external
limit (manual or auto reset).

If the installation is to comply with ASME or
Canadian requirements, an additional high
temperature limit may be needed. Consult
local code requirements to determine compli-
ance. The limit should be installed as follows:

- Install the limit in the boiler supply pip-

ing between the boiler and any isolation
valve.

- Maximum set point for the limit is

194ºF.

- For wiring of the limit reference Fig. 20,

page 29, using the external limit/manual
reset terminals on the 24V terminal strip.
This will provide a "hard" lockout
requiring a manual reset of the control.

Backflow Preventer

-

Use a backflow preventer valve in the
make-up water supply to the unit as
required by local codes.

Boiler System Piping Applications

It is recommended on all piping applica-
tions to utilize a primary/secondary pip-
ing arrangement as a means to provide
freeze protection of the boiler, which is an
integral function of the boiler control.
Maintain the minimum boiler flow rate,
see Graph 2 on page 70. For other piping
arrangements, consult the Engineering
Department at Triangle Tube or consult
other

approved/recognized

design

arrangement.

On piping applications utilizing a single
zone or other recognized piping design
arrangements, it is recommended that the
installer uses flow/check valves with
weighted seats at or near the appliance to
prevent gravity circulation.

Expansion Tank and Makeup Water

Ensure the expansion tank is properly sized for
the boiler volume (5 gallons [19 L]) and the
system volume and temperature.

Undersized expansion tanks will cause
system water to be lost through the pres-
sure relief valve and cause additional
makeup water to be added to the system.
Eventual boiler heat exchanger failure
can result due to this excessive makeup
water addition.

CAUTION

BEST PRACTICE

BEST PRACTICE

16

Advertising