Checking the ultimate vacuum, Notice – VACUUBRAND BVC professional G User Manual

Page 60

Advertising
background image

page 60 of 68

Position bottle in the support.

Depending on BVC version, position tubing

to hose nozzle or quick coupling.

Checking the ultimate vacuum

After any intervention at the equipment (e.g., repair / maintenance) the

ultimate vacuum of the pump has to be checked.

The pump achieves its ultimate vacuum if switching off at an atmo-

spheric pressure > 1000 mbar absolute, a maximum underpressure of

850 mbar (8 LEDs glow) and a leak-free apparatus.

Screw elbow fitting with silencer to the outlet

of the pump (max. 5 turns).

Remove adhesive tape at the cover plate.

If the pump does not achieve the ultimate vacuum:

- Whenever the diaphragms and valves have been replaced, a break-in

period of several hours is required before the pump achieves its ulti-

mate vacuum.

- In case of an unusual noise, switch off pump immediately and check

clamping disc positions.

If the specified ultimate vacuum is not achieved, and if this does not

change after the break-in period:

If necessary recheck valve seats and pump chamber.

NOTICE

In case of a false alarm of the level sensor after replacing diaphragms

and valves perform an adjustment of the level sensor, see section “Ad-

justment of the BVC level sensor to work properly with a new bottle, or to

correct false alarms”.

Advertising
This manual is related to the following products: