Assembling the connecting hose (mz 2d nt), Checking the ultimate vacuum – VACUUBRAND MZ 2S NT User Manual

Page 80

Advertising
background image

page 80 of 91

Assembling the connecting hose (MZ 2D NT)

19

20

17

MD 4CRL NT:

Note: Always perform a leak test using an appropriate leak detector

(e.g., helium leak detector) after opening the pump! Leak rate (inte-

gral) see “Technical data”, pg. 25.

If the pump does not achieve the ultimate vacuum:

- Whenever the diaphragms and valves have been replaced, a break-in

period of several hours is required before the pump achieves its ulti-

mate vacuum.

- In case of an unusual noise, switch off pump immediately and check

clamping disc positions.

If the specified ultimate vacuum is not achieved, and if this does not

change after the break-in period:

Check hose connectors at pump heads for leaks. If necessary recheck

valve seats and pump chambers.

Checking the ultimate vacuum

After any intervention at the equipment (e.g., repair / maintenance)

the ultimate vacuum of the pump has to be checked. Only if the pump

achieves its specified ultimate vacuum, the pump’s leak rate is low

enough to ensure that no explosive atmospheres will occur in the inte-

rior of the equipment.

17 mm

20 mm

Advertising
This manual is related to the following products: