Shutdown & storage, Notice – VACUUBRAND RZ 9 User Manual

Page 31

Advertising
background image

page 31 of 49

ballast valve cap or press the gas ballast switch at the

terminal box (RE/RZ 16). The manual gas ballast valve

is open if the arrow on the gas ballast cap is pointing

towards the inlet of the pump (RE 2.5 / RZ 2.5 / RE 6 /

RZ 6) or towards the labelling ”GB” (RE 9 / RZ 9).

- Close the manual gas ballast valve by turning the cap

180°.

Operate the pump without gas ballast only in case of a

clean vacuum system or when no condensable vapors

can occur.

Shutdown & storage

Has the pump been exposed to condensate?

- Allow the pump to continue to run with an open gas

ballast valve for a few minutes before switching off.

Long-term:

- Separate the pump from the application.

- Flush the pump with dry nitrogen.

- Carry out oil change (see “Oil change”, pg. 32).

- Fill the pump completely with new oil (more than mark

”max.”!).

Attention: Before restarting the pump, drain oil to the

maximum oil level (mark ”max.”)!

- Close the manual gas ballast valve.

- Close inlet and outlet ports (e.g., with transport caps or

blind flanges).

- Store the pump under dry conditions.

- If necessary, carry out oil change and maintenance pri-

or to use if the pump has been stored for longer than

one year.

NOTICE

Advertising
This manual is related to the following products: