Water distribution, Problem solving, Ater – Bonaire / Celair (Tekelek) User Manual

Page 12: Istribution, Roblem, Olving

Advertising
background image

LP SERIES OWNER’S MANUAL

Unit Maintenance

TEK600 SERIES CONTROL

Page 12

W

ATER

D

ISTRIBUTION

Check the water distribution system for blockage. Check the delivery tube for kinks or
holes. Check that the clamps are secure and in place.

P

ROBLEM

S

OLVING

THIS TROUBLE SHOOTING GUIDE IS A REFERENCE ONLY.

FOR SERVICE OR WARRANTY REQUIREMENTS PLEASE RING

YOUR NEAREST CLIMATE TECHNOLOGIES SERVICE PROVIDER

PROBLEM

PROBABLE CAUSE

REMEDY

a

Black - out

a

Wait

b

Tripped Circuit Breaker

b

Reset

c

Blown Fuse

c

Replace

Unit fails to start

d

Electrical Fault

d

Call Climate Technologies
Service Provider

a

Pump Seized

a

Call Climate Technologies
Service Provider

Pump fails to start

b

Pump Burnt Out

b

Call Climate Technologies
Service Provider

a

Float Valve Leaking

a

Check adjustment or replace
seal

Water leaking from
overflow

b

Drain from Celdek Pads

b

Adjust Ball Valve level

a

Loose Delivery Tube

a

Check and tighten

b

Break in tubing

b

Replace as necessary

Water Droplets in air
stream

c

Pump Delivers Excessive
Water to Pads

c

Adjust the Dialflo to reduce
the flow

a

Inadequate Exhaust

a

Provide more open area to
exhaust stale air

Excessive humidity

b

Outside humidity high

b

Turn pump off may assist.

a

Dirty Filters

a

Clean

b

Dry Filters

b

Check water delivery
system. Adjust dialflo if
necessary.

Inadequate Cooling

c

Dialflo not set correctly

c

Adjust dialflo so that the
pads have even saturation.

a

Unit located near odour
source

a

Remove source

Unpleasant Odour

Rapid formation of
white deposits on
pads

High Mineral Content

Bleed off should be set at
maximum. More regular
maintenance may be
required. Dump valve may
be required for cyclic
dumping

Advertising