Hand over, Controls setup & commissioning – Bonaire / Celair (Tekelek) User Manual

Page 23

Advertising
background image

LP SERIES OWNER’S MANUAL

Controls Setup & Commissioning

TEK600 SERIES CONTROL

Page 23

HAND OVER

The evaporative air conditioning unit will now be ready for operation and hand over to
the customer.

1. Setup up the control to the customer’s requirements e.g. MANUAL or AUTO.

2. Explaining the key features of the control that they will use.

3. Explain the operation of an evaporative air conditioner and the key responsibilities of

the customer e.g.:

Continuous Bleed requirement

Dumping cycles (If dump valve is fitted)

Venting the air via the side of the home the wind is not blowing from.

Maintenance

requirements

4. Present the customer with their Owner’s Manual for further explanation of the

product’s operation.

Advertising