Commissioning check list, General, Unit - ducted evaporative air conditioner – Bonaire / Celair (Tekelek) User Manual

Page 24: Ductwork, Site, Customer hand over, Ommissioning, Heck, Controls setup & commissioning

Advertising
background image

LP SERIES OWNER’S MANUAL

Controls Setup & Commissioning

TEK600 SERIES CONTROL

Page 24

C

OMMISSIONING

C

HECK

L

IST

General

!

All equipment ordered by the customer is installed.

!

The unit is level and secure.

!

The mains and control wiring are complete and the circuit breaker and GPO are
turned ON.

!

All Controller functions for the appliance operate.

!

All electrical or water connections are to manufacturers specifications and the
relevant electrical or plumbing standards and codes.

Unit - Ducted Evaporative Air Conditioner

!

The water supply line has been flushed to clear swarf and debris and is free of leaks.

!

The tank is free of foreign matter and debris and the water isolating tap is turned ON.

!

Water drainpipe work is completed and sealed.

!

The water basin fills with water and the float valve closes correctly when the water
level is 30-35mm below the overflow level.

!

The water pump operates correctly when turned ON at the controller.

!

The Dialflo water bleed rate is adjusted to suit local water conditions.

!

The Dump Valve (option). The tank drains correctly when unit turns off.

!

The fan deck is correctly located and the fan blade spins freely.

!

The fan operates through the entire speed range.

!

The minimum fan speed is correctly set.

!

Water distribution is even with the filter pads fitted and the air conditioner operating
pump and fan.

!

Areas of high water pressure (Exceeding 500Kpa) a water pressure limiting valve
must be fitted in accordance with AS3500. Consequential damage from high water
pressure is not covered by warranty.

Ductwork

!

All ductwork is completed to plan, correctly supported and airtight, with no bend less
than 1.5 x the ductwork diameter.

!

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and
wiped clean.

!

All roof penetrations are fully sealed and watertight.

!

Man hole cover replaced.

Site

!

All rubbish has been removed from inside and on the roof.

Customer Hand Over

!

The operation of the Controller.

!

The need to open windows and doors for the correct operation of Fresh Air
Conditioning

!

The operation of the bleed or dumping system and it’s importance to operate all the
time in ducted fresh air conditioning

!

Maintenance requirements