Drill pipe, Perform regular drill pipe care, Jt25 operator’s manual – Ditch Witch JT25 User Manual

Page 132

Advertising
background image

JT25 Operator’s Manual

Systems and Equipment - 131

Drill Pipe

CMW

Drill Pipe

Perform Regular Drill Pipe Care

Precondition New Pipe

Repeat this procedure three times for each piece of pipe before it is used the first time:

1.

Hand-lubricate entire surface of threads and shoulders of both ends of pipe with copper base tool
joint compound. See page 200 for recommended lubricant.

2.

Join pipe and tighten joint.

3.

Break joint.

4.

Move pipe back to box.

Lubricate Joints Before Each Use

Lubricate threads and shoulders of male joints with copper base tool joint compound. This prevents rust
and reduces wear on shoulders and threads. See page 165 for recommended lubricant.

Clean the Threads

Clean the threads as needed with high-pressure water and detergent.

Replace Worn SaverLok

Because each pipe comes in contact with the SaverLok, check SaverLok regularly for wear. Compare
condition of SaverLok threads to condition of your drill pipe threads. Replace SaverLok any time when its
thread condition is not better than thread condition of your drill pipe. Failing to replace SaverLok will result
in damaged drill pipe. See page 191 for replacement procedure.

Precondition a new SaverLok the same way you do new pipe. See “Precondition New Pipe” on page 131.

Rotate Pipe Order

Because the lead drill pipe is in the ground longer, it is subjected to higher shock loads and experiences
more wear. To help spread this wear evenly over all pipe, move the lead pipe from the previous job out of
the first position.

NOTICE: Failure to follow this procedure could result in fused joints. Pipe will be damaged or destroyed.

NOTICE: Do not use gasoline or other petroleum-based solvents. This prevents tool joint compound
from sticking to the joints and will reduce thread life.

Advertising