Start system, Prime drilling fluid pump, Jt25 operator’s manual – Ditch Witch JT25 User Manual

Page 89

Advertising
background image

Conduct a Bore - 88

JT25 Operator’s Manual

Start System

CMW

Start System

1.

Start drilling unit and remote fluid unit. Allow both engines to warm up.

2.

Enable tracker control mode if desired. See “Tracker Control” on page 121.

3.

Press top of drilling unit throttle switch. Engine will increase to full throttle. If you do not want to use
autothrottle mode, return switch to center position.

Prime Drilling Fluid Pump

Prime drilling fluid pump each time tank is changed. To prime the pump:

1.

Fill drilling fluid hose and connect hose to unit.

2.

Operate mixing/transfer pump at full speed for 1 - 3 minutes to discharge air from system.

3.

Return mixing/transfer pump to normal operating speed and continue the bore.

4.

If drilling fluid pressure surges are observed, repeat step 2.

IMPORTANT: Ensure that mixture of drilling fluid matches drilling conditions. See “Drilling Fluid”
on page 117.

Incorrect procedures could result in death, injury, or property damage.

Learn to use equipment correctly.

NOTICE: Failure to prime the drilling fluid pump will cause flow fluctuations, which will
make it difficult to control the washwand.

Pressurized fluid or air could pierce skin and cause injury

or death. Stay away.

Advertising