Lift, Pipe box lifting procedure, Load – Ditch Witch JT25 User Manual

Page 81: Jt25 operator’s manual

Advertising
background image

Transport - 80

JT25 Operator’s Manual

Lift

CMW

Lift

This machine is not configured for lifting. If the machine must be lifted, load machine into a container or
onto a platform appropriate for lifting. See “Specifications” for weight of machine.

Pipe Box Lifting Procedure

Pipe Box lifting points are identified by lifting decals. Lifting at other points is
unsafe and can damage machinery.

See “Remove/Install Pipe Box” on page 134.

Load

1.

Start drilling unit engine.

2.

Using tethered ground drive controller, pull drive mode switch into low position. See page 25.

3.

Move drilling unit to rear of trailer and align with ramps.

4.

Slowly drive unit onto trailer.

5.

Lower stabilizers to trailer floor.

6.

Lower drill frame to trailer floor.

7.

Stop engine when unit is safely positioned on trailer bed for proper tongue weight.

8.

Attach tiedowns to drilling unit where indicated on page 81.

9.

Ensure that all covers are properly secured.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

Attach trailer to tow vehicle before loading or unloading.

Load and unload trailer on level ground.

Block trailer wheels.

Prevent trailer sway by loading ten to fifteen percent of total vehicle weight (equipment plus trailer)
on tongue.

Advertising