Planning
CMW
Planning
1.
Gather information about jobsite. See page 61.
2.
3.
Classify jobsite. See page 64.
4.
5.
Check supplies and prepare equipment. See page 72.
6.
Setting Up at Jobsite
1.
2.
Mix drilling fluid. See page 117.
3.
Unload drilling unit from trailer. See page 82.
4.
Assemble drill string. See page 73.
5.
Position drilling unit and drill frame. See page 87.
6.
Assemble strike system. See page 111.
7.
Anchor drilling unit. See page 109.
8.
Connect fluid system. See page 87.
9.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.